ASKENG
SPEC COMPLIANCE ENGINE
Project
Diriyah Gate — Pkg 04
Discipline
Mechanical / HVAC
Review No.
RVW-0231 / Rev C
Status
In review — 3 of 4 agents
Chilled Water Riser Diagram
M-501-C · 47 clauses extracted
Reconciling
AHU Schedule & Specs
M-220-B · 112 clauses extracted
Cleared
Fire Rated Duct Spec Section
23 07 00 · 31 clauses extracted
2 flags open
Ductwork Layout — L03
M-310-A · 68 clauses extracted
Cleared
DROP DRAWING OR SPEC PDF TO QUEUE
01
Spec Compliance
Cross-checks drawing callouts against project spec sections clause by clause.
100% · cleared
02
Code Compliance
Validates against ASHRAE, NFPA and local authority amendments.
100% · 2 flags
03
Constructability
Checks clearances, access and sequencing against site conditions.
64% · running
04
Reconciliation
Merges findings, ranks severity and drafts RFIs for open items.
Queued
SECTION 23 07 00 · 31 CLAUSES 2 OPEN
01
Insulation thickness below minimum
Spec 23 07 00 §2.3 vs. Drawing M-310-A, Detail 4
Drawing calls 25mm on risers above ceiling; spec section requires 40mm minimum for this service. Discrepancy carries through 6 similar details.
FAIL
02
Fire damper rating unconfirmed at Level 03
Spec 23 07 00 §3.1 vs. Drawing M-310-A, Grid D-7
Damper schedule omits fire rating for the wall type shown at Grid D-7. Constructability agent flags a possible access clash pending confirmation.
REVIEW
03
Sealant class matches spec
Spec 23 07 00 §2.5 vs. Drawing M-310-A, Notes
Sealant class and application method called out on drawing match the specified fire-stop system throughout.
PASS
81%
THIS SET
2 open flags across 258 clauses reviewed
General document accuracy85%
Scaled drawing accuracy95%
Avg. review time / package11 min
Autodesk Construction CloudSYNCED
ProcoreSYNCED
Oracle AconexIDLE
Bentley SystemsIDLE